Logging a do-and-charge job
A do-and-charge job is work you do first and bill afterwards, at your rates, with no fixed price up front. A client rings, the alarm's gone off, a tech goes out, and you invoice the hour, the callout and the parts. Sammy's jobs can run this way as well as the quoted way.
Two kinds of job#
When you log a won job, you choose which kind it is:
- Fixed price: you quoted it, the client accepted, and you bill the accepted price (or claim it in stages). This is the job as it's always worked in Sammy.
- Do and charge: there's no quote. You and your crew log what was done as it happens, you put it on the job's bill, and you invoice the bill whenever you like.
Everything else about the job is the same: the site, who to call, the job card, the photos and files, the costs, the schedule, and the documents you write on it.
Log the job#
- Go to Jobs and tap + New, then Log a won job.
- Tap Do and charge at the top of the form. Sammy remembers your choice for next time.
- Give the job a short title if you want one, like "Call-out, 12 Smith St". Your jobs list shows it instead of the client's name, which helps when the same client has twelve jobs on the go.
- Under What's the job?, write what the job is and what the tech has to do. Tap Dictate and say it if that's quicker. You can leave this for later and fill it in on the job card.
- Add the client's PO number if they gave you one.
- Pick the client, and the project folder and site address if you have them.
- Tap Log job.
The job opens on its hub, marked Logged, with Do and charge in the facts under its title.
Agree your terms first (optional)#
Instead of a contract, a do-and-charge job has a Terms card. If you want your rates sheet or the client's work order signed before you start, upload it there and tap Send for signature: your client signs it the same way they'd sign a contract, and the job reads Terms agreed. If nothing needs signing, tap Skip or Mark as agreed.
Send the job card to your tech#
Open the Job Card and tap Share. Your tech gets a link that opens on their phone with no login: the title, the summary you wrote, the site with directions, who to call, and a place to log what they did. See Letting your crew log what they did.
Approve the work#
When a tech sends an update, it shows on the job under Crew updates and on your dashboard. Open it, check the hours and materials Sammy read out of it, fix anything, and tap Approve. Approving does two things at once:
- the hours and materials go into the job's costs, at what they cost you;
- the same lines go onto the job's bill for work done, at what you charge, each one ending with who did it and when ("Reset panic alarm · Dave, 9 Oct"), so the invoice says whose visit it was.
Sammy prices labour from this job's hourly rate, your labour rate rules, or your connected system's charge-out rate, and asks you once when it has none. Materials get your usual materials markup. You can change any figure before you approve.
Bill your own costs#
Hours, materials and other costs you add yourself (with + Log costs on the job's Costs) are what they cost you. To charge the client for one, tap Add to bill in its Bill column (on a phone, it's under the price).
Before it goes on, Sammy shows you:
- On the bill as: the words your client reads on the invoice. Change "Hours on site · Sam" to "Labour" if you'd rather not name your tech.
- Cost / unit: what it cost you. To change it, edit the cost itself.
- Markup / unit and Sell / unit: what you charge. Hours start at this job's hourly rate, and everything else at your usual markup for its type; the line under the markup says which setting Sammy used. Change either one and the other follows.
Once a cost is on the bill, Costs shows what it sold for and what you made on it (Sell and Profit), with the totals underneath, so a finished job shows at a glance what it cost and what it made. Costs you add later stay blank in those columns until they're on a bill too.
Tap Add to bill and it goes on. The cost then says On the bill, and Billed · W01 once that bill is invoiced, so nothing gets charged twice. Removing a line from the bill in the composer puts Add to bill back on its cost.
Invoice the work#
Money in on the job shows what's Billable: everything you've billed on this job, with a bar for where it's up to: Not invoiced (on the bill now), Invoiced and Paid. Under it is your Profit so far, ex GST. If some costs aren't on the bill yet, it says so ("2 costs not on the bill"); tap it to go to them.
Tap Invoice work done and every line on the bill goes onto the invoice, itemised, with the PO number as the reference. The bill closes once it's invoiced, and the next thing you add starts a new one (W02). Invoice after every visit, or let the bill build for the month.
The Bill for work done section lists what's on the current bill, with what each line cost you, what you're charging and your profit, and the bills you've already invoiced. Only the sell price goes on the client's invoice. Preview invoice shows you that invoice before you raise it, exactly as the client will get it, with Create invoice at the bottom when it looks right. Edit opens the bill so you can change the lines, add a line by hand, or ask Sammy to adjust them, the way you would on a quote (a bill has just the one view: no takeoff, plan or proposal, and nothing to download, because it becomes an invoice).
Good to know#
- You can change a job from one kind to the other from the ⋯ menu under Change billing basis. If a do-and-charge job has work on its sheet that isn't invoiced yet, switching it to fixed price keeps the sheet but hides Invoice work done until you switch back.
- A do-and-charge job doesn't have a contract sum or a budget, so the costs section shows what you've spent without a comparison.
- Changing a cost after it's on the bill doesn't change the bill: the bill is what you charge. Edit the line in the composer if the price should change too.
- Approving a tech's update on a fixed-price job records the costs only. If the work is extra, raise a variation.